Pre-FID Screening: Utilization Constraint

Pre-FID Screening: Utilization Constraint

Decision Gate

  • Threshold: ~65% effective utilization (CF_eff)
  • Failure regime: Temporal Decoupling Failure Regime
  • Default outcome below threshold: No-Go

Entry into this regime is not a degradation in performance. It is a loss of economic recoverability.

Utilization viability collapse chart with explicit threshold and failure regime

Signature utilization viability collapse chart for board and investment screening.

10-Second Screening Output

Status Trigger Decision handling
Proceed CF_eff >= ~85% and temporal penalty remains in low band with delivered-power viability Advance to diligence with explicit downside testing.
Caution CF_eff above structural threshold but near boundary and fragile to penalty escalation Proceed only with contracted buffers and stress-tested downside cases.
Rework Viability depends on storage oversizing, fragile support realization, or near-boundary assumptions Redesign procurement, storage, and process integration before capital commitment.
No-Go CF_eff < ~65% Stop advancement to FID. Economic recovery is not achievable within the current architecture.

Industrial Energy Constraint Triangle

  • Vertices: Cost, Utilization, Storage, Continuity
  • Rule: No system can simultaneously optimize all four vertices.
  • Consequence: Violating this constraint collapses viability.

Use This Before FID

Intermittent power is not a cost advantage unless it sustains utilization above the structural threshold required by industrial systems.

Run Pre-FID Stress Test View Full Utilization-Ceiling Note

For independent evaluation inquiries: jamie@insightquantix.com