~65% effective utilization (CF_eff)Temporal Decoupling Failure RegimeNo-GoEntry into this regime is not a degradation in performance. It is a loss of economic recoverability.

| Status | Trigger | Decision handling |
|---|---|---|
| Proceed | CF_eff >= ~85% and temporal penalty remains in low band with delivered-power viability | Advance to diligence with explicit downside testing. |
| Caution | CF_eff above structural threshold but near boundary and fragile to penalty escalation | Proceed only with contracted buffers and stress-tested downside cases. |
| Rework | Viability depends on storage oversizing, fragile support realization, or near-boundary assumptions | Redesign procurement, storage, and process integration before capital commitment. |
| No-Go | CF_eff < ~65% | Stop advancement to FID. Economic recovery is not achievable within the current architecture. |
Intermittent power is not a cost advantage unless it sustains utilization above the structural threshold required by industrial systems.
Run Pre-FID Stress Test{: .iq-button .iq-button-primary } View Full Utilization-Ceiling Note{: .iq-button .iq-button-secondary }
For independent evaluation inquiries: jamie@insightquantix.com